[1]
Padilla-Ceniceros, R., Pacheco-Martínez, J., González-Cervantes, N., López-Escobar , M.I., Soto-Zamora, M. Ángel, Luna-Villavicencio, H. y Reyes-Cedeño, I.G. 2024. Identification of documented constructive stages of the San Ignacio Bridge (Aguascalientes, Mexico) using electrical resistivity tomography (ERT). Ge-conservacion. 25, 1 (may 2024), 132-141. DOI:https://doi.org/10.37558/gec.v25i1.1276.